Tag Archives: UCR Parking Transportation

Public Meeting Notice On June 17, 2026 UCR North District Phase 3 Blaine Street Parking Structure Project.

Greetings,

The University of California, Riverside (UCR) will be holding the second community project review meeting to discuss the proposed North District Phase 3 and Blaine Street Parking Structure Project.

The community meeting will be held in person at the North District Building D, Room D112 from 6:00p.m. – 7:00p.m. on Wednesday, June 17, 2026.

Two hours of free parking (5:30p.m. – 7:30p.m.) will be available to all attendees within Parking Lot 18, located at the southeast corner of Canyon Crest Drive and Blaine Street (see graphic below as well as attached PDF with parking and meeting location).

ND3 Blaine St PS_Community Mtg 2 Flyer ND3 BSPS Community Meeting 2 Presentation

ND3 Blaine St PS_Community Mtg 2 Flyer

lot-18-to-nd-room-d112

This will be an opportunity to learn more about the project, provide feedback/comments, and meet project team members.

The proposed North District Phase 3 would entail development of approximately 1,300 -1,350 student housing beds, student housing support services, Central Utility Plant and thermal energy storage tank, and associated landscape and hardscape improvements. North

District Phase 3 is proposed along W. Linden Street between the existing North District Phase 1 and North District Phase 2 sites.

Blaine Street Parking Structure would entail development of approximately 2,000 parking spaces on the existing Parking Lot 27 along Blaine Street.

A copy of the meeting flyer which includes additional information and a project location map is attached to this email. Additionally, a copy of the meeting flyer and draft slide deck is provided on the following website under Community Meetings – https://pdc.ucr.edu/environmental-planning-ceqa.

For more information, or to submit questions or comments before or after the meeting, please contact:
Melissa Garrety, Senior Planner
UCR Planning, Design & Construction
(951) 827-7376

planning@ucr.edu

Stephanie Tang

Director of Campus Planning

UNIVERSITY OF CALIFORNIA, RIVERSIDE

PLANNING, DESIGN & CONSTRUCTION

951.827.1484 | https://pdc.ucr.edu/

UCR North District Phase 3 / Blaine Street Parking Structure Community Mtg 1

The University of California, Riverside (UCR) will be holding the first of two community project review meetings to discuss the proposed North District Phase 3 and Blaine Street Parking Structure Project.

image.png

The community meeting will be held in person at the North District Building D, Room D112 from 6:00p.m. – 7:00p.m. on Wednesday, April 8, 2026.

Two hours of free parking (5:30p.m. – 7:30p.m.) will be available to all attendees within Parking Lot 18, located at the southeast corner of Canyon Crest Drive and Blaine Street (see graphic below as well as attached PDF with parking and meeting location).

This will be an opportunity to learn more about the project, provide feedback/comments, and meet project team members.

Blaine Street Parking Structure would entail development of approximately 2,000 parking spaces on the existing Parking Lot 27 along Blaine Street.

A copy of the meeting flyer which includes additional information and a project location map is attached to this email. Additionally, a copy of the meeting flyer and draft slide deck is provided on the following website under Community Meetings – https://pdc.ucr.edu/environmental-planning-ceqa).

Meeting Flyer

Slide Deck

For more information, or to submit questions or comments before or after the meeting, please contact:
Melissa Garrety, Senior Planner
UCR Planning, Design & Construction
(951) 827-7376

planning@ucr.edu

UCR Lot 13 Parking Structure Meeting Notice

New Parking Structure Coming to UCR's Lot 13UCR will be holding the first of two community meetings to discuss a proposed parking structure on Monday, April 22. The meeting will be held from 6:00 pm – 7:00 pm in Room J-102 of the Bannockburn Housing Complex, located at 3637 Canyon Crest Drive, Riverside, CA 92507 – Note: Parking will be free, however please park in the North Bannockburn parking lot.

Click Here for Map

UC Riverside is proposing to build a new multi-story Parking Structure facility on the east portion of the existing campus Parking Lot 13, located at the north-east edge of campus directly south of Big Springs Road. This Project will construct a parking facility which will accommodate 1200 parking spaces (800 net new). This Parking facility will enhance the community and campus by creating a safe vehicle, pedestrian and bicycle friendly environment by addressing circulation along Big Springs Road and adjacent roadway alignments while effectively integrating safety amenities.

For more information on the project, please see the attached flyer.

If you have any questions, please contact:
Dave Bomba, Project Manager
UCR Planning, Design & Construction
(951) 827-1412
email: dave.bomba@ucr.edu
or
Jeff Kraus
UCR Office of Government and Community Relations
(951) 827-7073